EBT MODELING IN SN3
A trainload of coal snakes its way towards Saltillo.
The EBT used PRR standard gauge cars
sitting on narrow gauge trucks.
These maintenance buildings were bashed from NASG
Armco Steel buildings.
Number #12 (Millie) awaits the call to board another
tourist train.
The M-1 crossing the concrete bridge at Aughwick
Mills near Mt. Union.
The hopper on the left has the sides extended to add
to the capacity.
#12 with another coal load.
#12 emerging from Sideling Hill tunnel.
Railmaster's version of the M-1 gas-electric.
Scratch built version of the steel box car.